• Skip to Main Content
  • Skip to Navigation
  • Text Size Reduce Font Size Reset font size Reduce Font Size
  • Contarst Display
  • Normal Display

DEPARTMENT OF INDUSTRIES AND COMMERCE
DISTRICT INDUSTRIES CENTRE, THENI DISTRICT

Theni District Profile # Energy and Power


Energy and Power in Theni District

Head of office designation :

:

Superintendent Engineer ,
TEDC TANGEDCO,THENI

Office Address :

:

NRT Main Road,
NRT NAGAR,
THENI - 625531.

PHONE NO

:

04546-253145


Theni TNEB Department Profile

Theni Electricity Distribution Circle/ Theni was bifurcated form Madurai circle during 1993.It consists of 3 Nos of Distribution Divisions and 1 No C&I Sub Division, 43 Nos of Distribution sections and 4 Nos of C&I Sections. There are 3 Nos of Revenue Units under the Control of Distribution Divisions.

There are 3 Nos of Sub Stores :

  1. Theni
  2. Periyakulam
  3. Uthamapalayam

No Central stores located at Theni.

The Jurisdiction comprises of Theni, Periyakulam, Andipatty, Bodinayakanur and Uthamapalayam Taluks. There are 59 Nos of H.T. Consumers and 3,79,467 Nos of L.T. Consumers as on 31.03.2011


TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LTD.
THENI ELECTRICITY DISTRIBUTION CIRCLE ANNUAL ADMINISTRATION REPORT FOR THE YEAR 2010-2011

I ITEM GENERATION BY CONSUMERS
Total No. of units generated during 2010-2011 by the consumers from the capacitive generator sets installed in their premises 4,35,84,137 units.
II. ITEM BREAK DOWN AND INTERRUPTION
VOLTAGE NO.OF BREAKDOWN
230 KV Under the control of Superintending
110 KV Engineer/Operation/Madurai
III ITEM NUMBER OF VILLAGES,HAMLETS AND ADI-DRAVIDAR
COLONIES ELECTRIFIED DURING THE YEAR 2010-2011. NIL ( Note : All the villages have already been electrified. )
IV ITEM TRANSMISSION AND DISTRIBUTION LINES IN OPERATION
Voltage of line As on 31.03.2011 Energized During 2010-2011 Total as on 31.03.2011
22 KV HT LINE 2206.970 34.190 2241.160
LT LINE 9977.680 118.490 10096.170
DISMANTLED LINES DETAILS
H.T Lines NIL.
L.T Lines NIL

V ITEM DISTRIBUTION TRANSFORMERS.

As on 31.03.2010 EBERGUSED DYRUBG
2010-2011
DISCONNECTED / TRANSFERRED / TAKEN OVER DURING 2010 -2011 TOTAL AS ON
31.03.2011
NOS CAPACITY IN KVA NOS CAPACITY IN KVA NO CAPACITY IN KVA NOS CAPACITY IN KVA
1 2 3 4 5 6 7 8
3,32 3,59,492 256 16,429 -- -- 3,579 3,75,921

V ITEM VO : 10 EXTRAHIGH TENSION SUB – STATIONS AS ON :31.03.2011

SL. NO NAME OF THE SUB- STATION NO. OF TRANSFORM ERS VOLTAGE RATIO IN KV CAPACITY IN MVA AGGREGATE IN MVA CAPACITY
1 2 3 4 5 6 7
1 THENI 230/110/22 KV SS 2 230/110 100X2 200 241
1 110/22 25X1 25
1 100/22 16X1 16
2 PERIYAKULAM 110/22 KV SS 2 110/22 10X2 20 20
3 ANDIPATTY 110/22 KV SS 4 110/22 10X2
25X2
20
50
20
50
4 KADAMALAIGUNDU 110/22 KV SS 2 110/22 10X2 20 20
5 VAIGAI DAM 110/22 KV SS 1 110/22 16X1 16 16
6 RASINGAPURAM 110/22 KV SS 2 110/22 10X2 20 20
7 BODINAYAKANUR 110/22 KV SS 2 110/22 10X2 20 20
8 UTHAMAPALAYAM 110/22 KV SS 2 110/22 16X2 32 32
9 KAMACHIPURAM 110/22 KV SS 4 110/22 10X2
25X2
20
50
20
50
10 VANNATHIPARAI 110/22 KV SS 2 110/22 5X2 10 10
11 MADURAPURI 110/22 KV SS 2 110/22 10X2 20 20
12 GANDAMANUR 110/22 KV SS 3 110/22 10X1
25X2
10
50
10
50
13 CUMBUM 110/22KVA SS 2 110/22 16X2 32 32
14 MARKAYANKOTTAI
110/22KAV SS
1 110/22 10X1 10 10

IV HIGH TENSTION SUB –STATION

----------------- NIL --------------------

VII ITEM NO: 12 DISTRIBUTION TRANSFORMERS

AS NO 30.03.2010 ENERGISED DURING
2010- 2011
DISCONNECTED/TRANRERRED / TAKEN OVER DURING 2010-2011 TOTAL AS ON
31.03.2011.
NOS CAPACITY IN KVA NOS CAPACITY IN KVA NO CAPACITY IN KVA NOS CAPACITY IN KVA
1 2 3 4 5 6 7 8
3,323 3,59,492 256 16,429 -- -- 3,579 3,75,921


1 Name of Circle

THENI

2 Salient Particulars

i) Jurisdiction

District

Theni

Area in sq. km

1066

Total population/ No of consumers

1080785Nos- 378808 consumers

No of Town/Village Panchayats/

22Nos

No of Municipalities/corporation

4Nos

No of Parliament Constituency

1No

ii) Technical Details

RENUGA BIO-MASS, 4.54MW.

No of Generating Stations (hydel)

3
i PYR 4Nosx35 mva
ii SLYR 1Nosx35mva
iii Vaigai 2x3mva

No of Substations

14

i) 230KV SS

1

ii) 110/22KV

13

Grid

1

Non Grid

13

iv) 33/11KV

0

Manned

Manned

Unmanned LTSS

Nil

No of Dedicated Feeders

1(HT feeder)

No of Feeders

65Nos

Urban - 11KBV

-22KV

29

Rural- 11KV

22KV

35

No of Distribution Transformers

3588 Nos

HT Lines in KM

2248.96km

LT Lines in KM

10113.490km

iii) Power Management

Circle Maximum Demand

167.28MW

Minimum Demand

72MW

Daily Consumption

120MW

Sustained Demand

2.00MU

% growth rate

5%

iv) Commercial Details

Nos SCs

HT: MVA:

58 Nos/ 40.360MVA

LT MVA

378750 Nos

Revenue:

For the month of 04/2011.

HT/ Month

479 (Lakhs)

LT/ Month

662.80 (lakhs)

Line Loss%

Arrears:

Local Body

34 (Lakhs)

Government Department

Nil

3 Development Works as on 19.03.2011

Up Coming Power plants with stage

On going SS

Nil

Programmed SS for next year

1) 110/22KV Veerapany SS with 1x16MVA power Transformer
2) 110/22KV Thevaram SS with 1x16MVA power
Transformer

Augmentation of Power Transformers

1) In Markeyan Kottai 110/22KV SS, proposed 1x10MVA power Transformer
in addition to Existing 1x16MVA power Transformer.

Requirement of Power Transformers with priority/period by which required

1) No 110/22KV 10MVA power Transformer (MAY
2011)for 110/22KV Markeyan kottai SS.

4 Staff Strength

i) Provincial

Sanctioned

563

Available

425

Vacancy

123

ii) RWE (Helper, Wireman, LI, CA, CI Category Wise)

1216

Sanctioned

624

Available

592

ITEM NO: 13 ( a) CONNECTED LOAD DURING 2010-2011.
APPENDIX- VIII A

I INDUSTRIAL HIGH TENSION LOW TENSION
NO .OF CONSUMER CONNECTED
LOAD IN KW
NO OF CONSUMERS CONNECTED LOAD IN KW
1

Textile

--

---

7

125.420

2

Cement

--

--

--

--

3

Steel.

--

--

--

--

4

Aluminium

--

--

--

--

5

metal works other then steel and Aluminium

--

--

--

--

6

Tennary

--

--

--

--

7

Chemical

--

--

--

--

8

Degence

--

--

--

--

9

Cordite Factory

--

--

--

--

10

Drugs and pharmaceutical products

- -

--

--

--

11

Engineering workshop

--

--

53

1854.520

12

Ceramic and glass

--

--

--

--

13

Paper and straw board

--

--

--

--

14

Food production (Oil, Rice, Flour and
Sugar mills)

--

--

19

121.230

15

Match factories.

--

--

--

--

16

Printing press.

--

--

--

--

17

Mines.

--

--

--

--

18

Industrial Estates.

--

--

9

142.520

19

Other Industries.

3

765.900

71

687.080

Total

3

765.900

159

2930.770

II

Agricultural.

--

--

621

3010.120
III

Domestic lights and fans.

--

--

11124

11033.710
IV

Commercial.

--

--

3648

4740.200
V

Railways Traction railways non- traction

--

--

--

--
VI

Bulk supply to municipal Licencies.

--

--

--

--
VII

Project works (Board, PWD ,etc.,)

--

--

--

--
VIII

Other States

--

--

--

--
IX

Government Departmental Building
(offices, Education Institution, Hospitals, etc.,)

--

--

19

105.38
X

Waters works.

--

--

165

517.050
XI

Street lights.

--

--

115

39.310
XII

Miscellaneous (Load not specifically covered above).

--

--

26

90.080
XIII

Huts.

--

--

757

36.940

Total

3

765.900

16634

22503.560

ITEM NO; 13(b) CONNECT LOAD AS NO 31.03.2011.
APPENDIX – VIII B

SL. NO CLASSIFICATION OF LOAD BOARD AREA
HIGH TENSION LOW TENSION
NO .OF CONSUMERS CONNECTED LOAD IN KW NO OF CONSUMERS CONNECTED LOAD IN KW

I

INDUSTRIAL

1

Textile.

26

25388.600

466

4529.882

2

Cement.

--

--

--

--

3

Steel.

1

2970.000

4

100.060

4

Aluminium.

--

--

1

11.800

5

Metal works other then steel & Aluminium.

--

--

12

91.600

6

Tennary.

--

--

1

7.500

7

Chemical.

--

--

20

430.957

8

Defence

--

--

--

--

9

Cordite Factory.

--

--

4

22.400

10

Drugs and pharmaceutical products.

--

--

3

19.700

11 Engineering workshop. --

--

666

10020.276

12 Ceramic and glass. --

--

4

86.300

13 Paper and straw board. 1

476.000

--

--

14 Food production (Oil, Rice, Flour and Sugar ills) 6

2492.720

740

1223.650

15 Match factories --

--

10

136.400

16 Printing press --

--

74

310.940

17 Mines --

--

--

--

18 Industrial Estates --

--

61

1186.280

19 Other Industries 13

3013.200

1864

45993.480

TOTAL

47

34340.52

3930

64171.225

II Agricultural -- -- 36003 171680.406
III Domestic lights and fans -- -- 265362 195486.966
IV Commercial 7 2323.000 48337 64358.015
V Railways Traction Railways non- traction -- -- -- --
VI Bulk supply to municipal Licencies -- -- -- --
VII Project works (Board, PWD, etc.,) -- -- -- --
VIII Other States -- -- -- --
IX Government Departmental Building
(offices, Education Institution, Hospitals, etc.,)
4 793.000 2508 8114.958
X Waters works -- -- 3238 11194.775
XI Street lights -- -- 3005 2147.684
XII Miscellaneous (Load not specifically covered above) -- -- 63 141.092
XIII Huts. -- -- 17021 757.19
TOTAL 58 37456.520 379467 518052.311

FORM-C

IX ITEM NO. 14 RURAL INDUSTRIES IN RESPECT OF LT SERVICES 2010-2011

SL. NO DESCRIPTION URBAN RURAL
CONNECTED LOAD DURING 2010-2011 TOTAL AS NO
31.03.2011
CONNECTED LOAD DURING 2010-2011 TOTAL AS NO
31.03.2011
NO KW NO KW NO KW NO KW

1

Rice Milling and Flour
Milling


12


206.370


446


4622.045


3


38.640


239


2448.260

2

Oil Pressing

--

--

35

724.700

--

--

56

569.600

3

Sugarcane crushing

--

--

--

--

--

--

7

109.200

4

Talkies

--

--

26

231.000

--

--

33

323.500

5

Cotton Ginning

7

276.840

249

2479.090

--

--

192

1926.754

6

Tape waving

--

--

70

644.700

--

--

68

655.000

7

Miscellaneous

122

2045.980

1717

33551.529

15

362.940

792

15885.847

TOTAL

141

2529.190

2543

42253.064

18

401.580

1387

21918.161

X. ITEM NO. 15 DETAILS OF POWER SUPPLY IN AGRICULTURAL
PUMPSETS.
SL. NO NAME OF THE DISTRICT/ TALUK THENI-DISTRICT AS NO 31.03.2010. ENERGIES DURING 2010-2011 AS NO 31.03.2011.
NO KW NO KW NO KW
1 PERIYAKULAM TALUK. 6330

30478.595

112

591.450

6442

31070.045

2 ANDIPATTY TALUK. 8958

41446.178

144

658.210

9102

42104.388

3 UTHAMAPALAYAM TALUK. 11726

52503.950

188

1124.780

11914

53628.730

4 THENI TALUK. 4403

23433.528

91

348.790

4494

23782.318

5 BODINAYAKANUR TALUK. 3965

20808.035

86

286.890

4051

21094.925

TOTAL

35382

168670.286

621

3010.120

36003

171680.406


XI. ITEM NO. 16 ACTIVITIES OF THE WORKSHOP ATTACHED WITH DISTRIBUTION CIRCLE.

NO Workshop is attached to this circle



Superintending  Engineer
TEDC/Theni.


Digital India Programme

National E-Governance Division (NEGD)

BHIM (Bharat Interface for Money) is a Mobile App developed by National Payments Corporation of India

Directorate General of Foreign Trade (DGFT)

The Unique Identification Authority of India (UIDAI)